Autigny suspension bridge: engineering, suspension ropes and Webnet
The suspension bridge over the Glâne River was planned and built by apprentices from various branches. Jakob Rope Systems supplied the statics as well as the suspension ropes and Webnet stainless steel nets.
A new pedestrian bridge between Autigny and Posat was planned and installed by apprentice metal construction designers, metalworkers, surveying technicians and bricklayers from the canton of Fribourg. The project allowed the young professionals to develop their professional practice and interdisciplinary collaboration.
Swiss associations, partners and sponsors made this bridge construction project possible. The bridge will be opened in spring 2025.
Jakob Rope Systems was allowed to create the statics for the suspension bridge. We were also able to supply the supporting ropes and Webnet stainless steel nets.
The construction: The suspension bridge consists of 4 supporting ropes (2 ropes below and 2 ropes above, OSS diameter 22 mm with Forte fittings), which are connected to each other with 4 steel frames. The integrated, statically activated Webnet (diameter 2 mm, mesh size 40 mm) serves as a railing filling and load-bearing element that connects the walkway of the suspension bridge to the upper supporting ropes.
The dimensions: The suspension bridge has a span of 23 meters and is 2,30 meters wide. It provides a connection (across the Glâne river) for the Way of St. James from Autigny to Posat and vice versa.
Downloads
Active and passive protection assets for bridges with Webnet are persuasively timeless in design.
DownloadStructural security solutions for buildings, bridges, towers, viewing platforms and railway systems.
Download